Installation
Step 1:
- Choose between the mounting options horizontal or vertical and choose on which position the cable box should be. The position of the cable box is also on the template. Choose A, B, C or D accordingly.
- Place and stick the mounting template on the wall or ceiling (the mounting template has stickers on the backside).
- Mark the holes for drilling (choose the hole according to the position you have selected under point 1) – only 1 hole per cross (each position is marked with a different colour).
Step 2:
- Drill the holes with a suitable instrument and place in the bolts.
Step 3:
- Hang the panel.
Step 4:
- Plug in the socket.
Note: It is possible to install the panel with a hidden cable (direct connection to the main electricity cable). However, this needs to be done by a licensed installer.





